February 2023

Big's Gas StationEV Charging

Located at 25580 Blanco Road in San Antonio, TX, Big’s Gas Station EV Charging site fills a critical accessibility gap for electric vehicle owners near State Highway 281. With a perfect Plugshare score of 10, this site serves a diverse community of civilians and military personnel, offering the only public DC fast charger in the area. Meeting a regional demand for fast charging, it serves approximately 70 unique drivers each month and supports the growth of EV infrastructure within the community.

IMG_3104 copy
The Challenge

Filling a Void

The nearest DC fast chargers were previously only found at car dealerships, creating an access gap for residents and military personnel. Big’s Gas Station was tasked with installing a public charger to address this need and improve EV charging accessibility for the 815 registered electric vehicles within the zip code.

IMG_5437 edit
IMG_3099 copy
The Solution

Accessible Charging Hub

JF designed and installed a fast-charging station, focusing on ease of access, safety, and reliability. The station’s convenient location near single-family homes and a military base has enabled it to become a trusted charging resource. With robust utilization averaging 250 sessions monthly, the station demonstrates effective site planning and operational efficiency.

The Outcome

Sustainable Community Growth

Since its installation in February 2023, Big’s Gas Station EV Charging site has supported 921 charging sessions by January 2024, with utilization steadily rising. The site has consistently maintained its 10/10 Plugshare score, serving as a benchmark for quality and reliability, and generating $14,000 in revenue within the first year.

IMG_5373 copy
Screenshot 2023-03-02 113719 copy

KEY COMPETENCIES

Strategic Site Planning

Optimal location within a densely populated area, ensuring accessibility for both civilian and military EV owners.

Reliable Infrastructure

High-quality installation with a focus on station reliability, as evidenced by a 10/10 Plugshare rating.

Efficient Utilization

Achieves consistent usage, averaging 8 daily sessions with a total of 250 sessions monthly, meeting the area’s growing demand.

Community Engagement

Establishes a much-needed public charging hub, fostering EV adoption in the local community through accessible services.

Check Out Our Other Case Studies!