APRIL 2023
FLEET FACILITY REPLACEMENT AT
UNC GREENSBORO
FLEET FACILITY REPLACEMENT
AT UNC GREENSBORO
The University of North Carolina at Greensboro (UNCG) recognized the need to upgrade its aging campus fueling facility, used for refueling its diverse fleet of campus vehicles. UNCG partnered with JF through a Sourcewell Contract to deliver a state-of-the-art fueling system designed to meet today’s standards. This comprehensive project included the demolition of the old system and the installation of a modern facility featuring advanced equipment and safety measures.


AGING INFRASTRUCTURE DEMANDS
AGING INFRASTRUCTURE DEMANDS
UNCG’s original fueling system had exceeded its operational lifespan, posing risks related to compliance, efficiency, and reliability. The Facilities Team needed an experienced partner to design and implement a replacement system that could meet modern standards while navigating budget fluctuations and regulatory requirements.
MODERN SYSTEM EXECUTION
MODERN SYSTEM EXECUTION
JF designed and implemented a custom fuel system replacement. The work included:
- Demolition and removal of the old system.
- Installation of (2) 10,000-gallon double-wall steel underground storage tanks.
- A pressurized piping delivery system.
- Environmental tank monitoring.
- A new fuel island complete with modern dispensers and a fuel management system.
Through clear communication, professional execution, and adherence to stringent regulatory requirements, the project was completed successfully.
EXCEEDING EXPECTATIONS DELIVERED
EXCEEDING EXPECTATIONS DELIVERED
UNCG’s new fueling facility was completed on time and within budget at a total cost of $499,356.89. The result was a safe, reliable, and environmentally compliant fueling station for campus operations. Exceptional site cleanliness post-construction and outstanding communication throughout the project left UNCG Facilities Operations highly satisfied.

KEY COMPETENCIES
KEY COMPETENCIES
Comprehensive Project Execution
Full demolition and modern system installation to meet contemporary needs.
Regulatory Expertise
Adherence to stringent environmental and safety standards, ensuring compliance with state regulations.
Customer-Centered Collaboration
Seamless communication and adaptability during budget changes and economic uncertainties.
Skilled Workforce
Professionalism and technical proficiency displayed by project teams, ensuring timely delivery and top-notch quality.
Site Cleanliness Excellence
Pristine post-construction site condition, exceeding client expectations.