2016

Stripes - Lubbock, TXAdding High Flow Diesel

In a five-month project, PSI (legacy) constructed and installed high-flow diesel and DEF (Diesel Exhaust Fluid) capabilities at an existing Stripes c-store in Lubbock, TX.

This involved substantial site preparation, concrete pouring, and utility work across 52,000 square feet, addressing unique challenges like decommissioning old water wells and integrating advanced piping materials.

Screenshot 2024-11-14 102459 copy
The Challenge

Site Complexity & Prep

The project required extensive site work for optimal diesel and DEF installation at the c-store. The PSI team encountered multiple challenges, including compacting and leveling the site, managing unexpected abandoned water wells, and preparing for significant concrete work. Additionally, coordinating with sub-contractors for tasks like electrical, landscaping, and concrete work posed scheduling challenges.

Screenshot 2024-11-14 102604 copy
Screenshot 2024-11-14 102856 copy
The Solution

Strategic Coordination & Execution

PSI acted as the general contractor, organizing bids for subcontractors and overseeing key site operations. The team handled well closures, installed tanks with stainless piping for diesel and DEF, laid extensive concrete, installed canopy footings, and set up all electrical components. Each phase included thorough inspections, system startups, and final installations, assisted by PSI's Abilene office and local fuel maintenance experts.

The Outcome

High-Flow Diesel Success

The site successfully opened with high-flow diesel and DEF capabilities, providing Stripes customers with reliable fueling options. Despite challenges, PSI’s meticulous project management ensured compliance with city inspections and safety regulations. The final site incorporated efficient lighting, robust concrete, and up-to-date systems, improving operational flow and safety for the location.

Screenshot 2024-11-14 102459 copy
Stripes_Case

KEY COMPETENCIES

Project Management

Coordinated bids, subcontractor scheduling, and resource allocation, ensuring efficient project completion.

Site Preparation

Comprehensive clearing, compacting, and grading to support new diesel installation and 52,000 sq. ft. of durable concrete.

Specialized Installations

High-quality tank and piping systems for diesel and DEF, supported by new electrical and communication trenches.

Compliance & Safety

Managed inspections, decommissioned water wells properly, and met all city permitting requirements to guarantee site safety and compliance.